A worker inspecting the dam face just above the special supports installed to support the scaffolding for the job.
A view of the serious deterioration of the dam face that has to be repaired.
A worker spraying gunite (concrete) while a mason finishes the surface.
Masons finishing the concrete surface on the inside face of the dam.
A view of the extensive scaffolding required to repair the solid brick parapet wall atop this RPI building.
A closer view of the wall prior to removal of deteriorated material.
Workers inspecting the wall prior to repair.
View of the repair in process. Note the original thick, all-brick parapet has been replaced with a modern brick-faced concrete block wall.
Another view of the restoration work in progress. Note the way the brick and block is tied together with metal strips.
The Crown Point Project |
---|
Original: October 12, 2007.
Crown Point Added: August 28, 2008.